Monday, November 26, 2012

LG 37LB1D-UB LG 37LB1DA-UB GEMSTAR VBI MICOM DOWNLOAD


HOW TO DOWNLOAD GEMSTAR VBI MICOM FIRMWARE - LG37LB1DA
Equipment requirements:  
 MPLAB ICD2 equipment, PC and digital connector.
  • Turn on the MPLAB ICD2 POWER Supply.
  • After turn on the PC and MONITOR, select the ‘MPLAB IDE’ from the screen.
  • When the program is executed, select the MPLAB ICD2 from Programmer -> Select Programmer.
  • Select "Configure -> Select Device".
  • When the "Select Device" window appears, select the PIC18F1220 from "Device" and press OK.
  • Select "Programmer -> Connect".
  • When connected with the Micom, the display message on the Output window appears as below.
  • Select "File -> Import", select the Work HEX file and open.
  • Select "Programmer -> Program".
  • Download is executed and about 5 seconds later, the "Programming succeeded" message is displayed on the Output window and the Download process is ended.
  • The execution of process (6) is convenient when using the short-cut icon.
POD CERTIFICATE DOWNLOAD
PREPERATION
  • Connect the MEMORY JIG and PC.
  • Turn on the JIG MAIN POWER SWITCH.
  • After turn on the PC and MONITOR, execute the ‘Certificate Downloader v1.4’ from the screen.
ADJUSTMENT SEQUENCE
  • After open the ‘Certificate Downloader v1.4’, enter Connection set and set the as same below.
  • The port settings are determined by each PC's setup.
  • Select ‘Connection’ and SET connected to RS-232C.
  • After clicking "Enter", confirm that "Enter Password:" appears.
  • Click the "OpenFile - Download" button from CP Data Download, ‘select the Private Key’ appears and click ENTER.
  • After clicking ENTER, the ‘opens Private key' window appears and select the Private key applied to the SET.  The Private Key file name is on the Label of the Digital Board.
  • When the Dialog window appears, click OK and the write work will begin.
  • When ‘CP Data Download: OK’ does not appear, certificate has not Download correctly.
  • SET is rebooted and certificate Download work must be repeated.
GEMSTAR OPERATION CONFIRMATION
  • Factory Test S/W must be set to "GlinkTo PC Card" ON.
  • Turn on the TV and run Factory Test Program of PC.
Program only needs to run once, regardless of set quantity.
  • Enter the EZ adjust menu by pressing Adjust on the Service Remote Control (S R/C).
  • Go to number 1 Gemstar and press Enter.
  • TV set screen will appear as shown.
  • Confrim that VBI Test and Serial Test PASS from the screen.