HOW TO DISASSEMBLE DECK MECHANISM
Holder Clamp.
1) Release 2 Screws (S1).
2) Unhook 2 Locking Tabs (L1).
3) Lift up the Holder Clamp and then separate it from the Base
Main.
Clamp Assembly Disc
1) Place the Clamp Assembly Disc as Fig. (A)
2) Lift up the Clamp Assembly Disc in direction of arrow (A).
3) Separate the Clamp Assembly Disc from the Holder Clamp.
Plate Clamp
1) Turn the Plate Clamp to counterclockwise direction and then
lift up the Plate Clamp.
Magnet Clamp
Clamp Upper.
Tray Disc
1) Insert and push a Driver in the emergency eject hole(A)
at the right side, or put the Driver on the Lever (B) of the Gear Emergency and
pull the Lever (B) in direction of arrow so that the Tray Disc is ejected about
15~20mm.
2) Pull the Tray Disc until it is separated from the Base Main
completely.
Base Assembly Sled.
1) Release 4 Screw (S2).
2) Disconnect the FFC Connector (C1)
Gear Assembly Feed
Unhook the Locking Tab (L2) in direction of arrow.
Gear Middle
Gear Assembly Rack
Release the Screw (S3)
Rubber Damper.
Frame Assembly Up/Down.
Put the Base Main face down(Bottom Side)
1) Release the Screw (S4)
2) Unlock the Locking Tab (L3) in direction of arrow and then
lift up the Frame Up/Down to separate it from the Base Main.
NOTE: When reassembling move the Guide Up/Down in direction of
arrow(C) until it is positioned as Fig.(C).
When reassembling insert (A) portion of the Frame Assembly Up/Down in the (B) portion of the Guide Up/Down as
Fig.(B)
Belt Loading.
Put the Base Main on original position (Top Side)
Gear pulley.
Unlock the Locking Tab (L4) in direction of arrow(B) and then
separate the Gear Pulley from the Base Main.
Gear Loading.
Guide Up/Down.
Move the Guide Up/Down in direction of arrow(A) as Fig.(A)
Push the Locking Tab(L5) down and then lift up the Guide
Up/Down to separate it from the Base Main.
NOTE: When reassembling place the Guide Up/Down as Fig.(C) and
move it in direction arrow(B) until it is locked by the Locking Tab(L5). And
confirm the Guide Up/Down as Fig.(A).
PWB Assembly Loading
Put the Base Main face down(Bottom Side)
1) Release 2 Screws (S5)
2) Unlock the Loading Motor (C2) from the Hook (H1) on the Base
Main.
3) Unlock 2 Locking Tabs(L6) and separate the PWB(PCB)
Assembly, Others from the Base Main.