BASIC TAPE MECHANISM : 2ZM-3MK2 PR4NM
BASIC CD MECHANISM : AZG-1 ZD8RMDM
BASIC MD MECHANISM : AZG-7 DM
1. Remove the four screws (BVT2+3-10 W/O SLOT) of A. Remove AZG-4 in the direction of the arrow.
2. Remove the four screws (VTT+3-4) of B. Set the mechanism in the PLAY state. Remove the HLDR, SHIELD TOP in the direction
of the arrow.
3. Remove the two screws (S-SCREW, MD TF) of C. Remove the two screws (S-SCREW MD T) of D. Remove the four FFCs and remove the MD MECHANISM.
4. Remove the screw (VW+1.7-5) of A. Remove the HEAD, OWH. Remove the two screws (VTT+2-3) of B. Remove the PLATE ASSY, SLIDE L and the PLATE,
SLIDE R. in the direction of the arrow.
5. Move the ZZG-D in the direction of arrow (a). While pushing
the BOSS in the direction of arrow (b), remove it in the direction of arrow
(c).
6. Remove the CAM, LOAD in the direction of the arrow.
CAUTIONS WHEN ASSEMBLY
1. Assembling the CAM, LOAD
Move the LEVER ASSY, CAM in the direction of the arrow as
far as it can go. Rotate the CAM, LOAD
so that its positioning hole is moved as close as possible to the shaft of the
LEVER, SW H. Attach the CAM, LOAD so
that it engages with the teeth of the GEAR, IDLER2.
2. Assembling the PLATE ASSY, SLIDE L
Align the shaft of the PLATE ASSY, SLIDE L with the
arrow-marked position of the CAM, LOAD.
CLICK ON THE PICTURES TO MAGNIFY