Power
supply Circuit diagram _ Firmware Upgrade_Factory Setting_ Sharp LC24LE150 _
LED TV
ADJUSTMENT PROCEDURE (Entering and cancel the adjustment process
mode)
1 While holding down the INPUT and Volume DOWN keys at the same time, plug in the AC cord to turn on the power. (“K” standing for inspection process mode is displayed on the upper left position of the screen.)
2 Press the Channel DOWN and Volume DOWN keys at the same time. (The adjustment process mode screen appears.)
3 To cancel it, turn off the power using the Power switch or remote control.
1 While holding down the INPUT and Volume DOWN keys at the same time, plug in the AC cord to turn on the power. (“K” standing for inspection process mode is displayed on the upper left position of the screen.)
2 Press the Channel DOWN and Volume DOWN keys at the same time. (The adjustment process mode screen appears.)
3 To cancel it, turn off the power using the Power switch or remote control.
Remote controller key operation and description of display in
adjustment process mode.
Software upgrading.
1 Plug off the LCD TV.
2 Insert the USB device to the USB terminal at the LCD TV. (Make sure that the latest software is installed in the USB device).
3 Hold the LCD TV power key and plug on the LCD TV.
4 LCD TV is on and detecting the USB device.
5 A few seconds later, LED light (orange) will blink indicating the software upgrading.
7 T V will automatically restart when software is successfully installed
8 LCD TV is running with the latest software.
1 Plug off the LCD TV.
2 Insert the USB device to the USB terminal at the LCD TV. (Make sure that the latest software is installed in the USB device).
3 Hold the LCD TV power key and plug on the LCD TV.
4 LCD TV is on and detecting the USB device.
5 A few seconds later, LED light (orange) will blink indicating the software upgrading.
7 T V will automatically restart when software is successfully installed
8 LCD TV is running with the latest software.
FACTORY SETTING
AC power is plug off after shipment setting is done.
Caution: Do not plug on again after shipment setting is done. If do, please re-do the shipment setting. Do not Power off with remote control.
AC power is plug off after shipment setting is done.
Caution: Do not plug on again after shipment setting is done. If do, please re-do the shipment setting. Do not Power off with remote control.
SMPS SCHEMATIC
CLICK ON THE PICTURES TO ZOOM IN