Tuesday, January 19, 2016

Sharp XE-A106 ELECTRONIC CASH REGISTER – Schematic - Master Reset or Initialization Procedure

Sharp Cash Register XE A106 - Circuit Diagram - How to Reset 
or- Initialize - Test Procedure
Reset Procedure or Initialization
Master reset: Clears all the memory and initializes each preset parameter
1. Turn off the power (Power OFF).
2. Let the ECR be without the memory back up battery.
3. Turn the mode switch to the others of Power-off position.
4. Turn on the power (Power ON). When the master rest is completed, the buzzer sounds intermittently three times.
5. Attach the memory back up battery to the ECR.  The master reset can also be accomplished in the following case.
Power OFF: Means disconnecting the AC power supply to the machine. (Specifically, unplugging the machine.)
Power ON: Means connecting the AC power to the ma-chine. (Specifically, plugging in the machine.)
[In case a power failure occurs when the machine has no battery installed, the master reset operation is automatically performed after the power has been restored.]
MAIN BOARD Schematic
PWB
TEST PROCEDURE
Perform the keyboard check with the sum check data of the key code.
Enter the sum check data of each model in the four digits preceding the diag number 02, and compare the data with the key position code which is added until the “CA/AT/NS” key is pressed.
If the data coincides with the code, the completion print is performed.
If not, the error print is performed.
Completion print 02
Error print - - -02
XXXX Sum data
DISPLAY BUZZER TEST
KEY OPERATION
3 => PO
TEST PROCEDURE
Check the continuous buzzer sound and the display state.
Display state:
8. 7. 6. 5. 4. 3. 2. 1.
The decimal point will shift from the lower digit to the upper, step by step (500mSEC). To cancel the test mode, press any key, and the buzzer will stop and the completion print is performed.
Completion print =>  03
DRAWER TEST
KEY OPERATION
4 => PO
TEST PROCEDURE
The drawer opens with the above key operation. Check that the drawer is open. Press any key to terminate the test.
Completion print =>  04
PRINTER TEST
KEY OPERATION
5 => PO
TEST PROCEDURE
With the above key operation , the print test pattern is repeatedly printed.
Pressing any key will terminate the test after the completion of one cycle print. (The receipt is issued at the end.)
TIME DISPLAY TEST
KEY OPERATION
8 => PO
TEST PROCEDURE
DESTINATION DISPLAY
KEY OPERATION
9 => PO
TEST PROCEDURE
Display the destination code as follows.
Display       0
Display X (X:0
To terminate the test, press any key.
Completion print 09
CPU VERSION NO. PRINT
KEY OPERATION
6 => PO
DESCRIPTION
The CPU version No. are printed with above key operation.
(Print example)
0102           CPU version NO.
06
This test is terminated when printing is completed.
BATTERY VOLTAGE SENSOR TEST
KEY OPERATION
7 => PO
TEST PROCEDURE
Displays A/D conversion port read value.
0155 or greater : Normal
0154 or smaller : Low battery display
0138 or smaller : No battery display and MSR is done when power on.
To terminate the test, press any key.
Completion print => 07