FEEDING PIPE OF THE UPPER SPRAY ARM AND FILTER SUPPORT
- Filter support is freed after the related screw is loosened. After the notch of the feeding pipe of the upper spray arm is released, both of the parts are taken out. After the notch located on the filter support is extended, it is removed from the upper feeding pipe.
SIDE WALLS
- A total of 7 screws, as 3 in the front, 2 at the back and 2 at the top, are loosened and the side walls are taken out.
REGENERATION CONTAINER
- The electronic counter on the flow meter located at the left lower corner of the regeneration container, is taken out as demonstrated in the photo and detached from the socket.
HINGE PLATES
- 3 screws on the both sides are loosened. 2 screws on the both sides of the connection sheet of the hinge arm are unscrewed and the plates are removed.
DETERGENT CONTAINER
- To replace any cable, the cable case is opened and the replacement is made.
CONCRETE SHEET
- Both of the sidewalls are dismantled. A total of 4 screws connecting the concrete sheet to the frames from both sides are unscrewed. 2 screws that connect the base to the concrete sheet are unscrewed. Water inlet hose is taken out. Base is dismantled. The connection made to prevent the occurrence of siphonage in the drain hose is removed by cutting the hose clamp. The concrete is taken out and the sheet is freed from its connections.