LAMP REPLACEMENT PROCEDURE
Lamp: 130W UHM Lamp
- After cooling fan has stopped, and Standby[R] on [G] indicator turns solid Red, unplug the power cord. The projector has a forced cooling feature. After power switch is turned Off, and something during about the first minute of normal cooling fan operation, press 'Menu' for 5 seconds. The cooling fan will change to high speed for about 10 minutes. The "C-d' status code will be displayed.
- Loosen the 2 screws and remove the lamp cover unit.
- Push the portion of the Lamp Holder Lever, and release the lamp holder from the fastening hook.
- Pull the lamp unit. The lamp may be hot. Be careful when handling.
- Install the new lamp unit.
- Make sure that the lamp hold lever is in the original position.
- Replace the two seating screws.
- Plug the power cord.
- Press [Power & Input] buttons together for about 5 seconds when lighting up red by 'Power LED' to reset the lamp.